Approx. 65' of Straight Rail, Does Not Include Bends, NOTE: Rail System in Working Cooler Can ONLY BE CUT OUT – NO Beam Supports or Celing Bracing Can Be Removed, Processing Floor Structure Only, Badland 1500lb Winch, Winch Rail Dropper, System Inclu
Working Cooler and Processing Floor Rail System
Approx. 65' of Straight Rail, Does Not Include Bends, NOTE: Rail System in Working Cooler Can ONLY BE CUT OUT – NO Beam Supports or Celing Bracing Can Be Removed, Processing Floor Structure Only, Badland 1500lb Winch, Winch Rail Dropper, System Inclu
- Bidding closes at
- Location
- Washington Court House, Ohio, United States (US)
